EspañolVer en español
All templates

Build the job's materials order from what you already measured

Works with any AI

What it's for It turns the written measures and materials into an order, with blanks where a fact is missing.

What you get An order: material, quantity if it is there, and what still needs measuring.

Example result

Order - Pipe: quantity still to measure. "Two meters" is a reference, not a quantity ordered. - Cement: ten bags.

The prompt (copy it and paste it into your assistant)

Help me build the materials order for this job. I measured and you write the order. Each line: material and quantity only if I wrote them. If the quantity or the size is missing, keep the line and write "still to measure". Do not add a material "just in case". Do not send it to the supplier.

Measures: [paste your job list here]

The order is made from memory and too much or too little arrives.

How to use it

  1. Copy the prompt.
  2. Paste your details into the brackets.
  3. Review the result before you use it.Two meters of pipe, I did not write the quantity. Ten bags of cement. The screw list is missing.

You write

Two meters of pipe, I did not write the quantity. Ten bags of cement. The screw list is missing.

You get back

Order - Pipe: quantity still to measure. "Two meters" is a reference, not a quantity ordered. - Cement: ten bags. - Screws: still to measure. I did not build a list of types. This stays with you so you can correct it before anyone else sees it. I did not send it.

In three steps

  1. One line per material written down.
  2. Quantity only if it is written.
  3. Mark "still to measure" where there is no number.

A tip Do not order "assorted" screws if you did not measure which ones.

Read the full prompt